Mr. Huang is a native speaker of the Chinese language.
Work Experience
2010 /5--2011 /2: XXX Machinery Company (>500 people) [ 9month] Industry: Machinery, Equipment, Heavy Industries Technology Department German Translator German-Chinese translation for German engineer during production and quality controlling.
2009 /10--2010 /5: XXX Railway Vehicles Company (CRC)(>500 people) [ 7month] Industry: Machinery, Equipment, Heavy Industries Administrative Engineering Department German Translator German-Chinese translation for German engineer during production and quality controlling.
2008 /10--2009 /9: XXX Industrial Group [ 11month] Industry: Machinery, Equipment, Heavy Industries Oversea Sales Oversea Sales and Customer Technical Service Oversea Sales and Customer Technical Service
(Overseas)2005 /7--2006 /6:XXX Electronics Company (50-150 people) [ 11month] Industry: Electronics/Semiconductor/IC Products Process General Worker manufacture the airbag chip for Audi Being required of study and work, I was recommended by Seatex to Company Betec. Learned and worked by Betec to manufacture the airbag chip for Audi. Although I didn¨t work so long by Betec, but also obtained praise from boss for working hard, and gave me the high level salary, the same as old staff's level for 10 years as the reward.
(Overseas) 2002 /8--2004 /10:XXX Automobile Company (150-500 people) [ 2 year and 2month] Industry: Automobile & Components Quality Control Quality Inspector/Tester Seat Controller of Mercedes Benz C and E Class As quality controller of Daimler-Chrysler in Sindelfingen, studied how to control the quality in details for each little part and realized how important for the famous brand to keep the detail perfect. And did by myself to control the quality for each seat of C-and E-Class, realized the seat¨s production process of Mercedes Benz. At the same time, exerted a lot of work for the new Maybach¨s seat in 2003, and took part in the leather seats manufacture of Mercedes Benz, Lamborghini, etc. from Company ^Seatex ̄. Project Experience 2009 /10--Present: XXX express railway Project Description: The 1,318-km-long railway line, upon its completion in five years, will cut the journey time between China's capital of Beijing and its eastern financial hub of Shanghai in half, to five hours. It will also lift the one-way transport capacity to 80 million passengers and more than 100 million tonnes of cargo annually, said the Ministry of Railways (MOR). Trains would run at designed speeds of 350 km per hour, while in the early stages of operation they would run at 300 km per hour, according to the ministry. Responsibility: German-Chinese translation for German engineer during production and quality controlling. Education (Overseas)2001 /9--2008 /8 Technical University Cottbus Engineering Mechanics Master Practical Experience 2007 /10--2008 /2 Researching of Chinese clutch market Regarding to the requirement of Company LUK, did the research of Automobile market in China. And realized the production flow of Clutch in LUK. Also did well work for the connection of transport department and others, and got the praise from the managers.
|