4.3 Thermal Cycle 热力循环
4.3.1 The Bidder is requested to describe the Thermal Cycle in his Bid, while equipment outside the T-G Set Package Scope of Supply will be supplied by others. The base cycles shall have uncontrolled extraction points used for feedwater heating. Two or three motor driven feedwater pumps and one standby motor driven feedwater pump are assumed available to the thermal cycle. Other configurations like two steam turbine driven feedwater pumps and one standby motor driven feedwater pump are also acceptable if these are the typical and proven design of the Bidder. 要求投标方对其投标书中的热力循环进行说明,而汽轮发电机组包供货范围以外的设备将由其他人提供。热力循环应有用于给水加热的抽气级。热力循环理论上有两或三台电动给水泵和一台备用电动给水泵。如果是投标方的典型和成熟的设计,也可以采用其他配置,比如两台汽动给水泵和一台备用的电动给水泵。
4.3.2 No air ejectors will be used and the gland steam condenser is located downstream of the condensate pumps. 汽封蒸汽冷却器布置在凝泵下游。系统不采用射汽抽气器。
4.3.3 The thermal kit provided by the Bidder for each Turbine-Generator offered shall include as a minimum the following curves, diagrams, correction factors, calculation formula, etc. The thermal kit provided with the Bid shall contain finalized correction curves which will be reviewed and used to verify the guaranteed output. 投标方为其供货的每台汽轮发电机所提供的热力系统资料中应至少包括以下内容:曲线、图解、修正系数、计算公式等等。与投标书一起提交的热力系统资料中应包含最终修正曲线,该曲线将接受审查并用于核实检验输出功率。 1. heat balance diagram at 10%、30%, 50%, 75%, 90%, 100% of rated output and 100% of VWO, CCR , SCR output. 额定输出功率的10%、30%、50%、75%、90%、100%时和VWO, CCR , SCR输出功率的100%时的热平衡图。 2. output vs. exhaust pressure. 输出功率与排气压力力应对应。 3. output vs. condenser CW inlet temperature under the different clean factors . 输出功率与不同清洁系数下凝汽器冷却水入口温度对应。 4. output vs. condenser CW inlet flow. 输出功率与凝汽器冷却水入口流量对应 5. output vs. main steam wetness. 输出功率与主蒸汽湿度对应 6. output vs. steam generator blowdown proportion. 输出功率与蒸汽发生器失水事故比例 7. exhaust pressure vs. CW inlet temperature of rated output under different clean factors 排气压力与不同清洁系数额定功率的冷却水入口温度对应。 8. heat rate vs. load for the range from 30% of rated output to VWO output. 热耗率与负荷对应(从30%额定功率到VWO功率范围内)。 9. exhaust loss curve. 排气损失曲线 10. expansion line end points vs. steam flow at outputs (10%、30%, 50%, 75%, 90%, 100% of rated output and 100% of VWO, CCR, SCR output). 在输出功率(额定输出功率的10%、30%、50%、75%、90%、100%和VWO, CCR , SCR输出功率的100%)下的膨胀线终点与蒸汽流量对应。 11. effects of low reheated steam temperature on heat rate and output. 低再热蒸汽温度对热耗率和输出功率的影响。 12. curves showing the stroke of control valves vs. MWe or steam flow. 控制阀行程与功率或蒸汽流量关系的曲线。 13. methods for predicting the performance of the turbine at different conditions including moisture removal stage effectiveness curves, stage group efficiency curves as a function of flow and pressure and all other necessary tables, curves, calculation formula and instructions. 预测汽轮机在不同工况下性能的方法,包括除湿阶段效率曲线、在蒸汽流量和压力作用下的各阶段效率曲线、以及所有其它必需的表格、曲线、计算公式和说明压力。
|
上一页
下一页 |
|
|
|