|
工程文件的索引英中对照翻译文件 |
2.3 index of engineering documents (ied) 2.3 工程文件的索引(IED) The Supplier shall establish an Index of Engineering Documents (IED) system for maintaining and providing the Purchaser with a complete listing of documentation (including drawings, data sheets, procedures, specifications, manuals, performance test data, design reports, calculations, etc.). 供方应建立工程文件索引(IED)系统,用于保持并向买方提供文件的完整列表(包括图纸、数据表、程序、规格说明、手册、性能测试数据、设计报告、计算结果等)。
IED is a documents management system which shall be used to manage and follow up the issuance and submission of all the engineering documents by Purchaser and Supplier. 工程文件索引系统是一种文件管理系统,用于管理和跟踪买方发布的所有工程文件以及供方提交的所有工程文件。
The first issuance of IED shall be submitted to the Purchaser for review in traditional paper copies and electronic file copy at Authorization to Proceed (ATP) date of the Contract. And then the IED shall be supplied at the end of each month in traditional paper copies and electronic file copy, and shall be certified by the Purchaser as being complete correct and current through the last day of that month. 工程文件索引的第一次发布应以传统纸质和电子文件版本的形式在合同的允许履行(ATP)日期提交给买方审核。然后工程文件索引应在每月末以传统纸质和电子文件的形式提供,并应由买方认定为完整正确而且在当月最后一天为最新版本。
Beijing Chinese Subtitling Translation Service Agency has translated many technical documents about index of engineering documents. 华译网上海翻译公司曾经翻译过大量有关工程文件的索引资料文件。
The following items shall be at least included in the IED: 工程文件索引中应至少包括以下项目: ? Identification number, revision, status and title of the document ? 文件的识别编号、修订、状态和标题 ? Forecast issue date of the document ? 文件的预期发布日期 ? Actual issue date of the document ? 文件的实际发布日期 ? Identification number of the transmittal letter from the Supplier to the Purchaser for remarks ? 供方发送给买方的意见征求函的识别编号 ? Transmittal reference (date + reference number) of Purchaser’s design review comments ? 买方设计评审意见传送文件参考(日期+参考号) ? Summary (ACC-AEN-RFC-NOC) of Purchaser’s design review comments ? 买方设计评审意见的总结(ACC-AEN-RFC-NOC) ? Related system or component or building /structure (where applicable) ? 相关系统或部件或建筑物/构造物(视适用情况) ? Supplier's internal reference number ? 供方内部参考编号 ? Indication of the final issuance (yes/no) ? 最终发布的指示(是/否) An IED management procedure shall be developed in the basis of mutually agreement. 工程文件索引管理程序应通过双方的商议制定。 |
上一页
下一页 |
|
|
|