Executive Summary C/O Pt Niaga Abi Zahara Coal Mine
Business Plan By Kilburn Energy Limited.
Descriptions Facts Of The Matter Remarks By Kilburn Energy
Commodity Coal Mine Green Field.
Grade > Cv6,100 Boaring Test Report Attach.
Location Sumatra (North), Indonesia. Area Map Shall Be Given Upon Loi
Total Hectares For Exploration 4,000ha (Allowed 3803ha) Full Details Available With Us
Boring Done 197 Ha Boring Test Chart Available
197 Ha Coal Reserves Found Estimated Between 5mil. To 6 Mil Geological Report Done
Estimated Coal For 4,000 Ha 30,000,000 Mt
Drilling Holes Done 18 Holes Full Boring Data Available
Drilling Done By Pt Ba
Average Seam Thickness 1.1s/D 11.03 Mtr Report Done
Exploration License Issued N0. Iup/Kp Exp.Done On 2007 Location.1992/30/Dfm/2010
Estimated Ob To Ore Ratio 1:10
Mining Licence Issued 24 April, 2010 Until 2030 Valid For 19 Years
Close Airport To Mine Sultan Syarif Kassim 11 Pekanbaru Regular Flights
Distance From Major City To Mine Abt 40km Information Available
Distance From Mine To Hotel Abt40km
Port Stockpile Capacity To Be Advised To Be Advised
Distance From Mine To Port Abt 190km
Port To Use To Export Out Dumai,Indonesia To Be Advised
Road Condition Width 8mtr, Thru Villages Toll Rights Signed Between Villages Done
Largest Truck Capacity For Hauling 35 Ton Any One Time Local Transportation Available
Others Upon Confirmation
Note.
The Mine Is Available For Joint Venture
The Equity For The Investor Is Given At 60% And The Mine
Owner Holds Back 40%
Offtake Contract At The Investors Discretion
With A Long Term Contract Pricing/Lower Than The Prevailing Market Price
Investment Required Is Us$ 8 Mil And Us$ 2 Mil For Infra -Structure Work At Site
Coal Raising And Contractors Appointment At The Investors Discretion And Choice.
The Investor Will Able To Operate The Mine The Best Way They Deem
Kilburn Energy Requires An Introduction Fee. 原件下载:
|