8.3.9 Only the volume of additional fines ordered or approved will be measured. The rate shall cover the cost of the supply and mixing in the additional fines. NOTE - Applicable only if an item for additional fines has been included in the schedule of quantities (see 8.3.2 and 8.3.3). 8.3.10 a) Provide, erect and commission on Site: Extra over 8.3.2 and 8.3.3, as applicable, for additional fines . . . . . . . . . . . . . . . . . . . . . . . Unit: m3 Screening plantlcrusher plant (as applicable to 8.3.2 and 8.3.3 only) 1) Screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum Single-stage crusher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum 3) Two-stage crusher and screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum 1) Screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum Single-stage crusher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum 3) Two-stage crusher and screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: Sum 1) Screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: No 2) Single-stage crusher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: No 3) Two-stage crusher and screening plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: No 2) b) Dismantle, remove from Site, and clean up Site: 2) c) Move on Site from one location to another and clean up Site: The terms of 8.3.6 of SABS 1200 ME shall apply. 8.3.11 The terms of 8.3.7 of SABS 1200 ME shall apply. 8.3.12 a) Cement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit:t b) Slaked lime . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: t c) Other fine material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unit: m3 Screened-out material not used in base (applicable to 8.3.2(b) and (d) and 8.3.3(b)(2) and (b)(4) only) Material added to filler for waterbound macadam The rate shall cover the cost of supplying, transporting from the point of supply to the point of off-loading at the site of placing, storage, placing, spreading and mixing with the filler. 8.3.13 Overhaul (haul exceeding 1 km) (as applicable to 8.3.2 and 8.3.3) . . . . . . . . . . . . . . . . . . Unit: m3.km Except that the freehaul distance shall be 1 km, the terms of 8.3.9 of SABS 1200 ME shall apply. 8.3.14 Borrow pits (as applicable to 8.3.2) The terms of 8.3.4(b) and (c) of SABS 1200 D shall apply. 8.3.15 Royalties (provisional) . . . . . . . . . . . . . . Unit: . . . . . . . . . . . . Stated sum原件下载:
|
|
|
|