|
南非土木工程施工标准 BE1部分:一般土方工程 英文原文节选 20100079 2-1 |
1 Scope This part of SANS 2001 covers earthworks carried out with heavy construction equipment or light construction equipment, or by hand, for general excavations, terracing, landscaping and cut and fill operations, such as in minor roads and private railway sidings. It specifies requirements for excavations for foundations for bridges, buildings and structures. It also covers excavation, filling, compaction and finishing. NOTE 1 SANS 1921-5 establishes further requirements for executing earthworks activities by hand. NOTE 2 SANS 1921-1 establishes management requirements for earthworks. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. Information on currently valid national and international standards can be obtained from the SABS Standards Division. SANS 2001-BS1, Construction works – Part BS1: Site clearance. SANS 10403:2003, Formatting and compilation of construction procurement documents. TMH1-A3, Standard methods of testing road construction materials – Method A3: The determination of the plastic limit and plasticity index of soils. TMH1-A7, Standard methods of testing road construction materials – Method A7: The determination of the maximum dry density and optimum moisture content of gravel, soil and sand. TMH1-A8, Standard methods of testing road construction materials – Method A8: The determination of the California Bearing Ratio of untreated soils and gravels. TMH1-A10(a), Standard methods of testing road construction materials – Method A10(a): The determination of the in-place dry density of soil or gravel by the sand replacement method. TMH1-A10(b), Standard methods of testing road construction materials – Method A10(b): Tentative method for determining the in-place density and moisture content of soils and gravels by nuclear methods. SANS 2001-BE1:2008 Edition 1 4 3 Definitions For the purposes of this document, the definitions given in SANS 10403 and the following apply. 3.1 backfill material placed in a certain manner in an excavation after specified operations have been performed 3.2 borrow material material obtained from various sources, such as borrow pits and widening of excavations 3.3 borrow pit excavation made for the procurement of material 3.4 CBR California bearing ratio load in newtons, expressed as a percentage of standard values, required to allow a piston of 1 935 mm2 to penetrate a surface of a compacted material at a rate of 1,27 mm/min to depths of 2,54 mm, 5,08 mm and 7,62 mm where the corresponding standard values for these depths are 13,344 kN, 20,016 kN and 25,354 kN, respectively 3.5 deviation difference between the actual (i.e. measured) dimension or position and the specified dimension or position 3.6 formation prepared surface on which the ballast and track are laid 3.7 liquid limit empirically established moisture content at the boundary between the liquid and the plastic states 3.8 modified AASHTO maximum dry density highest density obtainable when compaction is carried out on soil at varied moisture contents at the modified AASHTO compaction effort in accordance with the requirements of TMH1-A7 3.9 OMC optimum moisture content moisture content at which the maximum dry density of a soil is obtained for a specific compaction effort 3.10 overbreak excavation carried out in excess of the theoretical or specified profile 3.11 overburden unsuitable or unusable material cover over usable material in a cutting or borrow pit原件下载:
|
|
|
|