1、 Troubleshooting separation processe for mature field mstaliatons Solutions.
2、 Ormen Lange –NEW Field Deveiopment The 2nd largest gas fiesd discovery in the North Sea
3、 Condensate:6000to8500 m3 per day
4、 Gas.70million 8m per day
5、 Approx 11 billion USS investment costs
6、 ConSepT delivers internals to totally 16 qas-lipuld separators
7、 Liquid phases,variors modes oils and water
8、 Gas density up to60 kg/m3
9、 All fabrication are sub-contracted
10、 Main contractors are
11、 IKM Mekaniske,Norway
12、 Reinertsen Orkanger,Norway
13、 Dalian New Shipyard,China
14、 Detail mechanical engineering are partly sub-contracted
15、 Optimized
16、 Typicas design of a vertical gas scrubber suffering by poor separation performance
17、 Design check of vanepack loading
18、 Path linas colored by velocity magnitude (m/s)
19、 Poor velocity distribution in vessel
20、 Poor velocity distribution across vanepack
21、 Axial Flow Cyclone Technology
22、 Example axial flow cyclone versus vanpucks
23、 Tests presented by 3rd partty,does not include ConSepT DC
24、 Typical optimization of horizontal primary separators
25、 Known Separator Problems
26、 Improved Separation by New Internals
27、 Statoil’s K-lab test facility at the land terminal Karsto,Western coast of Norway
28、 K-lab test facility allows testing of full scale scrubber internals on real fluids at pressures up to 150 barg
29、 ConSepT is the first vendor allowed to test a complete scrubber configuration Tests will be carried ort from 25.nov-1.dec 2004
30、 K-lab test facility at Karste
31、 ConSepT IVD ConSepT DC 原件下载:
|